---
title: "The Decarbonised Mine: A Weekend, Not Weeks | Snapsight"
description: "A two-day mining conference replaced its record-edit-transcribe-write-design routine with summaries and reports from Snapsight."
canonical: https://www.snapsight.com/en/case-studies/the-decarbonised-mine-how-atwo-day-mining-conferencereplaced-weeks-of-post-eventwork-with-snapsight
updated: 2026-10-13
---

[Customer stories](https://www.snapsight.com/en/case-studies)

**The Decarbonised Mine** Andrew Slavin and team 2025 · Perth

# Weeks of post-event work, finished over a weekend.

A two-day mining conference replaced its record-edit-transcribe-write-design routine with summaries and reports from Snapsight.

[Book a demo](https://www.snapsight.com/en/contact?interest=takeaways) [Start free](https://www.snapsight.com/signup)

![A speaker on stage at The Decarbonised Mine with presentation screens either side](https://www.snapsight.com/en/assets/decarbonised-mine-stage-DooRa5NU.webp)

## The story

### The challenge

The team runs everything in-house. After each event they recorded every session, edited the videos, transcribed them, briefed a journalist and designed the reports. It took weeks, sometimes months.

### What they ran

Snapsight on both days of parallel sessions: a summary after every session by QR code, then post-event reports. The AV team had never used Snapsight and set it up without trouble.

### What happened

Attendees scanned the QR codes after every session without being told how, and the post-event work was done over the weekend. Snapsight is now the team’s default.

## The numbers that mattered.

**500+**

mining industry professionals over two days

**1 weekend**

for work that used to take weeks, sometimes months

> “The whole process that used to take us weeks was just… finished.”

**Andrew Slavin** Leads the team behind The Decarbonised Mine

## What it looked like on the day.

![A speaker at the lectern at The Decarbonised Mine conference in Perth](https://www.snapsight.com/en/assets/decarbonised-mine-speaker-WHhG3Zte.webp)

The Decarbonised Mine · from the published story

## Products they used.

- [**Takeaways** Key takeaways and Idea Clouds while the session is still running.](https://www.snapsight.com/en/takeaways)
- [**Remix** Reports, white papers and posts made from what was said.](https://www.snapsight.com/en/remix)

## More events like this one.

[More on conferences](https://www.snapsight.com/en/solutions/conferences) [All customer stories](https://www.snapsight.com/en/case-studies)

Economist Impact · AI Innovation Asia 2024

### [Session highlights the same day, not 48 hours later.](https://www.snapsight.com/en/case-studies/redefining-event-intelligence-the-economists-ai-innovation-asia-2024)

Sheba Medical Center · ARC APAC Summit 2025

### [A dense medical programme. 40% of attendees used Snapsight.](https://www.snapsight.com/en/case-studies/arc-apac-summit-2025)

WiT Japan & North Asia 2024

### [Live within a week, run by one person.](https://www.snapsight.com/en/case-studies/wit-japan-north-asia-2024-elevating-event-experiences-through-ai-powered-insights)

## Run this at your next event.

Tell us about your programme and we’ll show you what attendees get.

Adapted from the case study Snapsight published on 4 July 2025.

---

This is a Markdown copy of https://www.snapsight.com/en/case-studies/the-decarbonised-mine-how-atwo-day-mining-conferencereplaced-weeks-of-post-eventwork-with-snapsight. The page itself is the reference.
